Rajputana-Malwa railway was about long and was one of the oldest and most important tracks when India became independent. It started from Ahmadabad, ran into the Rajputana near Abu Road facing south-west, and then ran north-east to Bandikui, where one branch led to Agra and another to Delhi. It also had branches from Ajmer south to Nimach via Chittorgarh and from Phulera north-east to Rewari. The line was constructed between 1874 and 1881 with the exception of the chord last mentioned, which was a later extension. The Indian government assigned the Bombay, Baroda and Central India Railway Company to work on the line since 1885. Before 1882, the Rajputana-Malwa Railway was known as the Rajputana State Railway. It was a metre gauge railway line which ran from Delhi to Indore Junction and to Ahmedabad via Chittorgarh. It was opened on 18 August 1876. The railway was renamed Rajputana-Malwa Railway when a new line from Ajmer to Khandwa via Chittorgarh, Ujjain and Mhow was added to it. On 9 March 1885, Jodhpur was connected to this network from Marwar Junction with metre gauge track and later became part of the Jodhpur - Bikaner Railway.
Udaipur-Chittaurgarh Railway
Udaipur-Chitor link, a portion of the Bina-Guna-Baran, was named after the towns it connects. It was the property of the Udaipur Durbar. The railway was long and was constructed between 1895 and 1899. It began operation in 1898. The capital expenditure was nearly 21 lakhs up to the end of 1904. The net profits averaged about 5 per cent.
The rail link of Ratlam Division has a history of more than 130 years. The metre gauge section was started in 1874, while the broad gauge came into existence in 1893. It is a major junction and a rail division of Indian Railways on metre and broad gauge lines. Four major railway tracks pass through Ratlam City; these are towards Mumbai, Delhi, Ajmer and Khandwa, in which the railway track along Khandwa is a metre gauge track. Neemuch - Nasirabad railway construction planning was made for joining Rajputana railway and Nasirabad Scindia railway to Neemuch. Although the survey of Neemuch - Nasirabad railway was carried out in 1871-72, construction started in 1879, and the work completed in March 1881.
The present
The broad gauge portion extends from Godhra to Bhopal, Ujjain to Indore and Ratlam to Chanderia via Chittaurgarh Junction. The metre gauge portion of the division extends from Ujjain to Khandwa.