Champ Clark Bridge was formerly a toll bridge. The bridge was named after James Beauchamp Clark, a former Speaker of the House from Bowling Green, Missouri. Clark served as Speaker from 1911 to 1919. During construction, a span of the bridge collapsed on September 6, 1927 due to faulty false work. The second span from the Missouri shore collapsed without warning just after quitting time. Two workmen were on still the span resulting in one fatality and one serious injury. This span collapse caused the failure of the first company formed to finance construction of the bridge, delaying completion for at least one year. The bridge was designed by Harrington, Howard and Ash, with construction being completed by the Missouri Valley Bridge and Iron Co. of Leavenworth, KS, and Wisconsin Bridge and Iron Co. of Milwaukee, Wisconsin. The bridge was narrow, allowing for two lanes of traffic on a deck. The bridge, originally painted silver, was repainted deep green in 1983, and repaired in 1999. In 2005, the Missouri Department of Transportation again rehabbed and repainted the bridge, replacing the green color of the bridge with gray. The bridge is 2,286.4 feet in length. The span over the main channel of the Mississippi River is 418.5 feet in length. In 2013, MoDOT heightened restrictions on oversized loads on the bridge, citing its age and width. Pull-off areas were constructed, and all wide/oversized loads were required to pull over and call the Louisiana police department for an escort. In 2014, a legal weight limit of 40 tons was put into place and the speed limit was reduced to 30 mph, due to accelerated deterioration. Until its replacement bridge opened, MoDOT affirmed that the bridge was safe to travel so long as motorists complied with the posted weight and speed limits.
Replacement
In 2015, MoDOT and IDOT were jointly awarded a federal TIGER grant to replace the bridgereduce the cost to each state and Illinois committed its share. In 2016, MoDOT announced inclusion of funding for its portion of the bridge replacement cost in its draft five-year plan. The new bridge opened on August 3, 2019, and retained the name of the old span. The old bridge was demolished in late 2019.