Bukit Panjang LRT line
The Bukit Panjang LRT line is a automated guideway transit line in Bukit Panjang, Singapore. The BPLRT is the only LRT line operated by SMRT Trains. As the name suggests, it serves 13 stations in the neighbourhood of Bukit Panjang and Choa Chu Kang.
The line is the first LRT line in Singapore, opening on 6 November 1999 by then Deputy Prime Minister and Defence Minister Dr Tony Tan. As an elevated people mover system, it is fully automated. The line uses Innovia APM 100 C801 and C801A rolling stock supplied by Bombardier, running in a two-car formation. The line is infamous for its frequent breakdowns due to its poor design and plans have been made to overhaul the system in 20 years.
History
The idea of Bukit Panjang LRT was first pitched in 1991 before the government announced that it would pilot the system there. Two years later, in 1996, construction began for the Bukit Panjang LRT, along which a few changes were distinguished from the MRT lines:- It became the first line with a fully automated train with no drivers
- There are 13 stations, a loop will be formed between stations for Bukit Panjang
- There is an integrated development at the former Ten Mile Junction LRT station, comprising a station, depot and shopping centre.
Back in 1994, then-Transport Minister Mah Bow Tan, told Parliament of the need for "efficient and affordable" public transport, and that the potential of LRT as an internal feeder service was being studied. There are other intentions of the LRT to replace all the feeder buses. Today, residents have LRT and few feeder bus services.
The project, which was contracted to Adtranz, Keppel Corporation and Gammon Construction, was completed on 6 November 1999.
On 5 August 1997, the Land Transport Authority awarded SMRT a licence to operate the LRT due to its experience with the MRT system.
On 10 December 2010, the Ten Mile Junction LRT Station closed due to retrofitting of station, and reopened on 30 December 2011; however, due to the low demand, on 13 January 2019, the LRT station became the first-ever operational train station in Singapore to be permanently closed. Due to this, LRT Service C, which ran from Ten Mile Junction LRT station to loop via Senja, ceased operations.
Incidents
An LRT train with 20 passengers crashed into an empty one at Phoenix station on 19 November 2000 after an operations officer failed to do a manual check of the lines before restarting the network system. The impact threw seated and standing passengers to the floor of the train, injuring five of them. The service was disrupted for seven hours but it was restored in stages and was fully functional again by 2.30 pm the same day. Then Communications and Information Technology Minister Yeo Cheow Tong visited the site soon after being told of the accident. However, the cause of the accident was never uncovered to this day.In the 2000s a chair was thrown out of a HDB block to the LRT tracks near phoenix station.Trains services were halted for 6 hours.
On 9 March 2015, during the evening peak hours, the Bukit Panjang LRT was suspended from service for a full 24 hours due to a power trip which was caused by a fire at Senja station. The fire was caused due to a sudden power surge and the fuse box failed to handle the surge. Usually the fuse box will trip the system and activate safety measures, but on that day the fuse box failed to do so and instead burst into flames. The problem was identified as arcing problem which was why the power "jumped". The reason for how the fire started, however, is still a mystery to this day.
On the late morning of 28 July 2016, a train departed Segar for Jelapang on Service B. However, the train sped past Jelapang, Senja and Bukit Panjang stations. One of the passengers said that the Emergency Stop Button was not working, and there was no response on the Emergency phone. According to a passenger, the train finally stopped before Phoenix station after another passenger managed to make a call on her mobile phone. Subsequent investigations showed that the train had a faulty antenna which resulted in the stations not being able to receive information about the train and thus did not stop the train at the stations.
On the evening of 27 September 2016, a track fault resulted in the damage of the collector shoes on 15 train cars. This resulted in multiple delays and disruptions across the entire network and the damaged collector shoes further damaged the entire network's tracks. During the morning peak of the following day, the already damaged track resulted in further disruption of 4 hours after train service started. When the trains did arrive at the stations, more problems occurred, including stalled trains, smoke, and stuck doors that staff had to open manually. With damaged tracks and half of the usual fleet running, the delays were more severe than previous cases this year. Later in the afternoon, SMRT announced on social media, Facebook and Twitter, stating that only Service B is available and train service towards Choa Chu Kang station are unavailable. However, they announced again that train service has been temporarily suspended as engineers were carrying out maintenance and repair works. Train service fully resumes at 5:45pm with only half of the usual fleet operating.
In the wee hours of 24 March 2017, a man was killed in a train accident after the last train left Fajar LRT station. Residents, however, reported nothing unusual around the time of incident, and the body was found when a staff went to the platform levels to do routine checks. Straits Times revealed that in the past there were 2 cases of accidents along the same line. In 2000, Mr See Chau Lai, a hawker assistant, died after he was hit by a train near Jelapang LRT station of the same LRT line. A coroner's inquiry found that he walked along the tracks after having too much to drink. That was the first fatality since the Bukit Panjang LRT started operations. In 2010, a LRT technician died of injuries sustained after being hit by a train at Phoenix LRT station. Mr Chia Teck Heng was checking the power rail between Phoenix and Bukit Panjang stations.
On 28 March 2017, trains broke down on the line, leading to 65 people having to be evacuated. The Singapore Civil Defence Force arrived shortly after and guided the stranded passengers to the nearest station. SMRT later revealed that the incident was due to a propulsion fault on one of the train cars.
On 9 September 2017, two trains successively stalled between Phoenix and Bukit Panjang stations, resulting in train services along the entire line becoming unavailable for six and a half hours. The first train was moved back to the depot whereas engineers had to evacuate stranded passengers from the second. The cause was found to be two broken rail support brackets that disrupted the ground and signal rails.
Controversy
On 12 September 2017, speaking at an event commemorating the completion of a power-rail upgrading project for the NSEW MRT lines, Minister for Transport, Khaw Boon Wan suggested that the Bukit Panjang LRT was built as an "afterthought" due to "political pressure". Mr Khaw said that the trains were designed in a "masochistic" manner, forcing commuters to go up and down with the twists and turns. He also compared the ride to a roller coaster, saying that it caused him dizziness. According to one commentator, his comment implies that his predecessor Mah Bow Tan erred in approving the LRT system. It also trivialises the work and contribution of railway engineers. Most critically, it implies that the PAP government had succumbed to pressure and spent hundreds of millions of dollars without serious consideration and robust planning.Services
There are two services on the line: A and B terminate at Choa Chu Kang.Stations
All stations, except Choa Chu Kang, have two facing side platforms. Choa Chu Kang has an island platform, similar to most Singapore MRT stations. All the stations on the LRT have half-height platform barriers, installed between 2016 and 2017. Choa Chu Kang station also has two additional platforms and a new set of fare gates to ease crowding during peak hours.Number | Name | Image | Interchange/notes |
Choa Chu Kang | Interchange with the ' and the ' ' Terminus for Services A & B | ||
South View | |||
Keat Hong | |||
Teck Whye | |||
Phoenix | |||
Bukit Panjang | Connected to the ' | ||
Petir | |||
Pending | |||
Bangkit | |||
Fajar | |||
Segar | |||
Jelapang | |||
Senja | |||
Ten Mile Junction | Permanently closed since 13 January 2019'' |
Rolling stock
The line uses Bombardier Innovia APM 100 "people-movers", similar to the ones used by the Changi Airport Skytrain until 2006, coded C801 and C801A. C801s have been in operation ever since the start of service on the line in 1999, while C801As were delivered and started operations in late 2014. Each unit is long.Train formation
Since 2015 till today, the majority of trains are in two-car formations. Two-car formations are no longer limited to peak hours only and are now used at all times. This is due to the increase in ridership and the large number of apartments around Bukit Panjang. The units are limited to a two-car train formation because of station length.Coupling is usually done in Ten Mile Junction Depot and the trains are coupled with the same car type: C801+C801 or C801A+C801A. Occasionally units are mixed for reasons such as rescue operations or testing.
Train control
The line is equipped with Bombardier's CITYFLO 550 fixed block signalling system for Automatic train control under Automatic train operation GoA 4. The subsystems consist of Automatic train protection to govern train speed, Automatic Train Supervision to track and schedule trains, and a computer-based interlocking system that prevents incorrect signal and track points settings.Future plans
SMRT and LTA announced for plans to completely overhaul the BPLRT system as the system is reaching its lifespan of 20 years. A few reasons for the overhaul of the system was due to the fact that the system has been plagued with problems since its first operation in 1999 and it is one of the two systems in the world that still uses the CX-100 train cars. On 8 March 2017, The Bukit Panjang LRT will be upgraded to a new conventional LRT system like power supply, signalling, rolling stock, track, stations, new signalling system and upgrading, including ruling out of the scrapping of the entire system or changing to an automated guided vehicles that is drawn on self-power, as it will cause major traffic congestion.On 3 October 2017, A tender for the revamp of the Bukit Panjang LRT was announced and was to be awarded in early 2018.
On 16 October 2017, Transport Minister Khaw Boon Wan has announced plans to shut the Bukit Panjang LRT down for a small number of years to pave the way for the system's overhaul. "If we want to do serious upgrading — essentially to close it down so that we can re-do the whole tracks and so on, so that we don’t have these ups and downs. And we’re evaluating that proposition," he told reporters at a press briefing.
On 23 October 2017, SMRT announced that the Bukit Panjang Light Rail Transit system will begin operations at 7am, instead of 5.30am, on all Sundays from 12 November 2017 until the end of that year, to allow more time for works to improve service reliability. "With the later opening on Sundays, our maintenance teams will have 1.5 more hours on top of the existing 2 hours every night. This is crucial as it allows our engineers to undertake heavy maintenance works and expedites scheduled replacement works," SMRT said in a Facebook post on 5 November 2017.
On 7 March 2018, the Land Transport Authority awarded the contract to Bombardier Transportation for $344 million on upgrading the system. This includes replacing the line's signalling system with the new Communications-Based Train Control system for a tighter headway between each trains and thus, reducing waiting time. 19 first-generation trains will be replaced while 13 second-generation trains will be refurbished. The upgrade is slated to be completed by 2024.
On 23 March 2018, SMRT said that the Bukit Panjang LRT line will be closed on 11 Sundays from 15 April to 24 June that year as part of maintenance works aimed to improving the reliability of the beleaguered system.
On 21 June 2018, SMRT said from 1 July to 28 October that year, all BPLRT stations will open on Sundays at 8am, instead of the usual 5.30am.
From 13 January 2019, the BPLRT network will close earlier at 11.30pm daily to enable SMRT to intensify and accelerate maintenance and system renewal works. Ten Mile Junction LRT station was closed due to low demand, and reused as a testing station for the new C801Bs.
From 1 December 2019, Service A on the BPLRT will only operate during weekdays peak hours while Service B will continue to operate as usual.