Build to order (HDB)


Build To Order is a Housing and Development Board flat allocation system that offers flexibility in timing and location for owners buying new HDB flats in Singapore. Eligible buyers planning to shift into a new HDB apartment in the near future, can apply for apartments in their preferred location from specific sites launched. Tender for construction will be called only if the number of applicants is at least 70% of the number of apartments in a specific contract, otherwise, the project is not built.
The waiting time for new flat applicants under the old Registration for Flats System is relatively short because flats are built ahead of demand. In comparison, the new BTO system requires a waiting period of about 3–4 years instead as such a system removes the need for the government to make projections ahead of demand. For eligible flat buyers in urgent need of accommodation, they can ballot for leftover units that are reintroduced into the market, Sales of Balance flats. In February 2019, it was announced that starting from the middle of 2019, flat buyers will be able to apply for unsold BTO flats online anytime on a first-come, first-served basis, and book a flat by the next working day. This is to help citizens with urgent needs for housing.
All BTO projects are designed by Surbana Corporation. To allow private sector a share of the public housing pie, HDB launched the Design, Build and Sell Scheme. The first pilot DBSS project at Tampines would be built by private developer, Sim Lian Group, but maintained by the HDB after construction.
However, in 2011, then National Development Minister Khaw Boon Wan suspended the DBSS scheme indefinitely.

BTO Unique Features

Build To Order system was introduced in 2001. The demand for BTO flats was low in the first years, resulting in the cancellation of 5 projects as it did not meet the requirement of minimum 70% application ratio. However, once the demand recovered, HDB has launched between 20 and 40 BTO projects annually since 2010, which consists of 15,000-28,000 units.
By the end of 2015, HDB has launched 251 BTO projects, comprising 168453 units.
Awarded BTO main contractors tender, each construction costs per 5-room, 4-room, 3-room & 2-room units are likely to be average about $160,000, $120,000, $80,000 & $40,000 respectively. This also include the cost of sub-contractors and construction of multi-storey carpark, Lifts, Electrical Substation, Child-care center, Children Playground, Fitness Corner, Linkway Shelter & Open Space landscape etc.