Bowling Green Assembly Plant
The Bowling Green Assembly Plant is a General Motors automobile factory in Bowling Green, Kentucky. It is a specialized plant assembling GM's Y-body sports cars, the Chevrolet Corvette and formerly the Cadillac XLR.
History
The first 300 Corvettes were hand built at a plant in Flint, Michigan in 1953. Production was moved the next year to a facility in St. Louis, Missouri and then finally ended up in 1981 at the Bowling Green Assembly Plant. General Motors opened the Bowling Green plant for production on June 1 that year, with most of the 900 Corvette workers from St. Louis transferring to the new plant. What was once an abandoned Chrysler air-conditioning unit factory is now a 1.7 million square foot facility that employs almost one thousand people. Guided tours of the plant are available throughout the year on weekdays, three times a day.Investments
Many large investments have been made to keep the plant as updated and cutting edge as possible. As the Corvette improves throughout the years, the technology to create it has to be revamped as well.2017 | $500 million for the retooling of the general assembly line, paint booths, and robotic inventory system |
2014/2013 | $3.5 million for the relocation of the Performance Build Center to Bowling Green |
2013/2012 | $131 million for the plant remodel to make way for the C7 changeover, with $52 million for the Body Shop |
2007 | $4.5 million for conveyor addition and remodel |
2005 | $12 million for ELPO paint system |
2005 | $5 million in ANDON global error proofing |
2005/2004 | $19 million for C6 model changeover |
2005/2004 | $3 million for paint sludge system/ air balancing |
1996 | When production of the C4 Corvette ended in 1996, the plant was gutted and rebuilt to prepare for the more modern C5 Corvette. |
Performance Build Center
The performance build center allows engine aficionados to build their own specialty engines. With the relocation of the performance build center from Michigan to Bowling Green, it allows customers to be able to build and watch the production of their car now all in one location. The opening of this center in Bowling Green is adding 20 new or relocated jobs to the community as well.The center is the source of all the hand assembled dry sump engines. These would be the 6.2L LS3 V8 engine of the grand sport coupe, the 7.0L LS7 V8 Z06 engine, and the 6.2L supercharged LS9 engine for the ZR1.