Blue line (Stockholm metro)


The Blue line, is one of the three Stockholm metro lines. It is long, and runs from via to where it branches in two, and continues to and as lines 10 and 11 respectively.

History

Groundbreaking occurred on 2 September, 1966 and the line was opened nine years later on 31 August 1975, between and via. On 5 June 1977, the branch from Hallonbergen to opened, and on 30 October the same year, the line was extended in the opposite direction from T-Centralen to. The next section opened, on 19 August 1985, was between and via. At that time line 10 was dfiverted over this section, and no more passenger trains operated on the Hallonbergen–Rinkeby section. Since then the section has only been used for access to the depot in Rissne.
The primary reason for constructing the line was the need for public transport to the large residential areas in the northwestern part of Stockholm, built during the period 1965–1975. Several of these areas, however, were without rapid transit during the first years because the opening of the metro was delayed until 1975. During those years Tensta and Rinkeby were served by feeder buses from Spånga station.
The blue line was more costly to build than the previous lines because the general requirements for building design increased over the years. The total cost of the Blue Line was approximately in 1975 currency.

Opening dates

Future plans

Nacka and Gullmarsplan

When the blue line was designed during the boom years of the 1960s, there were also plans to build an extension from Kungsträdgården to Nacka, but they were not realized. However, in 2013, it was decided that the line will run from Kungsträdgården to Nacka centrum via Sofia, Hammarby canal, Sickla and Järla. Construction was expected to have started in 2019 and completed seven to eight years later. A new bus terminal will be built at Nacka centrum to relieve congestion at for services to different parts of Nacka and Värmdö municipalities.
The transportation review also included an extension from Sofia to, which would include transferring the branch from the Green line to the Blue. The route through the Slakthus area was finalised in May 2015, along with a new underground station to replace and on the Green line. Construction started in 2019, and service is expected to begin in 2030.

Akalla to Barkarby

An extension beyond Akalla was approved for line 11. An intermediate station will serve the new Barkarbystaden residential area, and the line will terminate at the Stockholm commuter rail Barkarby station, allowing revisons to the commuter serivce. Official groundbreaking took place in September 2018, with completion now scheduled for 2026.

Route

At, the Blue line is the shortest of the Stockholm metro; however, the entire line is north of the Mälaren. Line 10 runs between Kungsträdgården and Hjulsta and includes 14 stations. Line 11 runs between Kungsträdgården and and includes a total of 12 stations. Six of the stations are served by both lines. The blue line carries an average of about 208,600 passengers per day, or 55 million per year.

Stations

In total, the Blue line has 20 stations, of which 19 are underground and one is on the surface. The tunnel between Hjulsta and Kungsträdgården is the longest of the system at, and is also Sweden's longest tunnel. Although the Blue line is almost entirely in tunnel, it also has the metro's longest elevated section at Kista, long.