The Blue Line, also known as Route 202, is a light rail transitline inCalgary, Alberta, Canada. Partnered with the Red Line, and future Green Line it makes up Calgary's CTrain network. Following its initial approval in 1976, the Red Line opened in 1981, with the first trains running on what is now the Blue Line in 1985.
History
Origin
The concept of a light railtransit system was approved in 1976 by the City of Calgary, with the first section running from Anderson Road in the southwest, northbound and into downtown, opening in 1981. Originally planned for 40,000 passengers per day, this initial section quickly achieved its designed ridership, and is now part of the Red Line. Based on the success of the Anderson-downtown section, the city approved a second route which would head northwest towards the University of Calgary and the Southern Alberta Institute of Technology. Opposition to the routing through the neighborhood of Sunnyside resulted in a switch of priority to the northeast, in what would become the Blue Line. The median of some main roads had already been allocated to serve as the right of way for what would become the CTrain's Blue Line, and the first section opened in 1985, before the originally proposed northwestern expansion. Both lines share a right-of-way through the downtown core.
In February 2008 the Western expansion of the CTrain began, extending the line from downtown towards 69 Street SW, and adding an additional six stations. The Western expansion opened at the end of 2012, ahead of the planned 2013 opening.
Capacity upgrade
Up until the completion of the Red Line's Fish Creek-Lacombe station, all platforms for the CTrain were originally designed to service three-car trains, although there had been enough space allotted to allow four car trains. Beginning in 2007 construction on station platforms began to expand the entire network to allow four-car trains, with the project being completed in 2017 for CA$300 million. In 2017 Calgary Tranist began running four-car trains on the Blue Line. The increase from three-car trains realized an additional capacity of 200 passengers per trip.
The city of Calgary published a study in 2012 describing a extension for the northeast leg of the Blue Line beyond the existing terminus at Saddletowne station, to run north along the west side of 60 Street NE, continuing west along the north side of 128 Avenue NE, then running north along the west side of 32 Street NE. One at-grade crossing would be created at 60 St and 88 Ave; the route would be grade-separated at the crossings of Airport Trail, Country Hills Blvd, 128 Ave, and Metis Trail. The study included four stations:
88 Avenue: an at-grade station at 88 Avenue NE and 60 Street NE, with 500 park and ride stalls
128 Avenue: an at-grade station at 128 Avenue NE and Redstone Street, with 200 parking spaces
Stoney Trail: the terminal at-grade station at 32 Street NE and Barlow Crescent, with 100 parking spaces
The four stations were studied with side-loading platforms, but the proposed terminal station at Stoney Trail would have sufficient space for a centre-loading platform. of tail tracks for LRV storage would be built north of the Stoney Trail station. By 2017, the proposed northeast leg extension had been truncated to three stations and. However, the project is not included in the City's mobility plan and has yet to be funded. The same 2012 study included concepts to provide transit connections from Calgary International Airport to either Saddletowne or the proposed 88 Ave station using light rail, tram, or bus services. The potential airport connector rail line along Airport Trail could be extended further west to connect with the proposed Green Line north-central leg, specifically at the future 96th Ave N station.
West leg
An extension west from the current terminus at 69 Street to a future station at Aspen Woods has been planned but not funded. The Aspen Woods station would be at approximately the intersection of 17 Avenue and 85 Street SW.