Baramulla railway station


Baramulla railway station is situated in notified area of Baramulla. It is the first station of 130 km long railway line which connects Kashmir Valley with Banihal.

History

The station has been built as part of the Jammu–Baramulla line megaproject, aiming to link the Kashmir Valley with the rest of the Indian railway network. The Leg 2 section of this network is incomplete. It is expected to be completed by 2021.

Reduced Level

The station is situated at an elevation of 1582.79 metres above mean sea level.

Design

Like every other station in this mega project, this station also features Kashmiri wood architecture, with an intended ambience of a royal court which is designed to complement the local surroundings to the station. Station signage is predominantly in Urdu, English and Hindi.