2012 Tour de Langkawi


The 2012 Tour de Langkawi was the 17th edition of the Tour de Langkawi, a cycling stage race that took place in Malaysia. It began on 24 February in Putrajaya and ended on 4 March in Kuala Terengganu which carried the slogan "Ready for the World". The race was sanctioned by the Union Cycliste Internationale as a 2.HC race on the 2011–12 UCI Asia Tour calendar.
The race was won for the second time by Colombia's José Serpa, after taking the lead of the race with his second consecutive stage win on the sixth stage, and held the lead until the end of the race. Serpa's winning margin over his team-mate José Rujano was 30 seconds, and the podium was completed by Víctor Niño of the Azad University Cross Team, 33 seconds behind Rujano and 63 in arrears of Serpa. In the race's other classifications, Serpa also finished at the top of the mountains classification, 's Andrea Guardini won the points classification, after taking a record-breaking six stage victories, and finished over twelve minutes clear of their nearest rivals in the teams classification. and their rider Alexsandr Dyachenko finished at the head of their respective Asian sub-classifications.

Teams

22 teams accepted invitations to participate in the 2012 Tour de Langkawi. Two UCI ProTeams were invited to the race, along with seven UCI Professional Continental and ten UCI Continental teams. The field was completed by three national selection teams.
;UCI ProTour teams
;UCI Professional Continental teams
;UCI Continental teams
;National teams
The race comprises 10 stages, covering 1413.4 kilometres.

Classification leadership

Final standings

General classification

Points classification

Mountains classification

Asian rider classification

Team classification

Asian team classification

Stage results

Stage 1

;24 February 2012 — Putrajaya,, Individual time trial
RiderTeamTime
1 24' 34"
2+ 01' 00"
3+ 01' 10"
4+ 01' 17"
5+ 01' 26"
6New Zealand+ 01' 31"
7 + 01' 33"
8+ 01' 38"
9+ 01' 39"
10+ 01' 46"

Stage 2

;25 February 2012 — Putrajaya to Melaka,
RiderTeamTime
1 03h 35' 19"
2+ 0"
3+ 0"
4+ 0"
5+ 0"
6+ 0"
7+ 0"
8+ 0"
9+ 0"
10+ 0"

Stage 3

;26 February 2012 — Melaka to Parit Sulong,
RiderTeamTime
1 04h 30' 11"
2+ 0"
3+ 0"
4+ 0"
5+ 0"
6+ 0"
7+ 0"
8New Zealand+ 0"
9+ 0"
10New Zealand+ 0"

Stage 4

;27 February 2012 — Batu Pahat to Muar,
RiderTeamTime
1 03h 57' 11"
2+ 0"
3+ 0"
4+ 0"
5+ 0"
6+ 0"
7+ 0"
8+ 0"
9+ 0"
10+ 0"

Stage 5

;28 February 2012 — Ayer Keroh to Pandan Indah,
RiderTeamTime
14h 32' 17"
2 + 0"
3 + 11"
4+ 11"
5 + 11"
6+ 11"
7+ 11"
8+ 24"
9+ 24"
10Aisan Racing Team+ 24"

Stage 6

;29 February 2012 — Proton, Shah Alam to Genting Highlands,
RiderTeamTime
1 03h 09' 37"
2+ 02"
3+ 46"
4 + 2' 32"
5+ 2' 53"
6+ 2' 53"
7+ 3' 25"
8+ 3' 26"
9+ 3' 28"
10+ 3' 35"

Stage 7

;1 March 2012Bentong to Kuantan,
RiderTeamTime
14h 25' 17"
2Seoul Cycling Team+ 0"
3+ 0"
4+ 0"
5+ 0"
6+ 11"
7 + 11"
8Malaysia+ 11"
9+ 11"
10Aisan Racing Team+ 13"

Stage 8

;2 March 2012 — Pekan to Chukai,
RiderTeamTime
12h 13' 27"
2+ 0"
3+ 0"
4+ 0"
5+ 0"
6+ 0"
7+ 0"
8 + 0"
9+ 0"
10+ 0"

Stage 9

;3 March 2012 — Kemasik to Kuala Terengganu,
RiderTeamTime
1 03h 27' 06"
2+ 0"
3+ 0"
4+ 0"
5+ 0"
6+ 0"
7+ 0"
8+ 0"
9+ 0"
10+ 0"

Stage 10

;4 March 2012 — Kenyir Lake to Kuala Terengganu,, Criterium
RiderTeamTime
1 2h 36' 42"
2+ 0"
3+ 0"
4+ 0"
5+ 0"
6+ 0"
7+ 0"
8+ 3"
9+ 3"
10+ 3"