100 Bishopsgate is a development of two mixed-use buildings under construction on Bishopsgate in London. The buildings will be situated on the eastern edge of the City of London financial district. Building 1 on the site will be a 40-storey tower comprising five floors of each and 32 office floors of between. Building 2 will be a seven-storey structure to be developed behind a retained façade, and will house restaurant and office floors of each. The developer is The 100 Bishopsgate Partnership, a joint-venture between Brookfield Office Properties and Great Portland Estates.
Site history
Along Bishopsgate, the 100 Bishopsgate site spans between St Ethelburga's Church and Camomile Street, with Clerks Lane separating two portions. In 1993 the IRA exploded a large bomb in Bishopsgate, 7 metres from St Ethelburga's Church. A number of surrounding buildings were badly damaged. A new building on the site was constructed, numbered 58, which included a public house, the Magpie and Punch Bowl which had operated at that location since 1839. The site was again renumbering to 86 Bishopsgate, and included a new public house, City House. Subsequently the buildings between St Ethelburga's and Camomile Street were demolished to make way for 100 Bisphopsgate.
Planning and design
A planning application was submitted by Great Portland Estates in September 2006 for the redevelopment of a site located at 61 St. Mary Axe, 80-86 Bishopsgate, 88-90 Bishopsgate, 12-20 Camomile Street, 15-16 St. Helen's Place and 33-35 St. Mary Axe. The scheme proposes a mixed-used development comprising two buildings of forty and seven storeys respectively. The main tower would be formed of five podium floors, each of, and 32 tower floors, each of. The form of the lower part of the tower is designed to resolve the complex geometries of the site; thus the lower floors are shaped as parallelograms and the upper floors are shaped as rectangles. The secondary building would be formed of seven storeys of each, providing restaurant and office space. A new public space of is situated in the middle of the site. The application was approved on 28 May 2008. In July 2011 the proposed height was increased by to.
Construction
Demolition of the buildings and infrastructure formerly on the site commenced in May 2011 and was completed later that year. The demolition work was complicated by the existence of six power substations on the site which needed to be kept operational until they could be bypassed. In May 2015, it was reported that building company T Clarke had agreed a revised contract for 100 Bishopsgate, with on-site activities scheduled to start in April 2016. Ground engineering work began on the foundations to prepare the project for construction.
Ownership and tenants
The developer is The 100 Bishopsgate Partnership, a joint-venture between Brookfield Office Properties and Great Portland Estates. In April 2010 Brookfield paid £43m for a 50% stake in the project. In October 2012 Great Portland Estates sold 37.5% of its 50% interest to Brookfield for £47.2 million leaving it with a 12.5% interest. In November 2015 Brookfield announced that they had let the first seven floors to the Royal Bank of Canada.